The Supervision of the Reconstruction Project of G246 Junction at National Highway G

The bidding project for the reconstruction project of the G246 road junction to the Shuangjiang section of the national highway of Longnan District was approved by the Development and Reform Commission of Longnan District with the document No. 2016 of No.232, issued by Minnan Development Co., Ltd., and the bidder was Chongqing Yinan District Traffic Construction Investment Co., Ltd. The construction funds come from financing and superior subsidies. The project has already met the conditions for tendering. The project is now undergoing an open tender for the supervision of the project and interested bidders are invited to participate in the bidding.

2. Project overview and scope of tender
2.2 Construction Scale and Main Construction Contents: This project starts at the intersection of Shuangjiang Toll Station and G246 and terminates at the intersection of G246 and Bayi Avenue. It has a total length of approximately 3.547 km. The first-grade highway standard with a design speed of 60 km/h Construction, two-way four-lane, roadbed width 32.5 meters, that is 2 x 5 meters (green belt) + 2 x 3 meters (sidewalk) + 2 x 8 meters (vehicle road) + 0.5 meters double yellow line, starting from the terminal station : K0+000-K3+500.000, with a total investment of approximately RMB 61.55 million.
2.3 The planned construction period: 10 months.
2.4 Supervision service period: See the bidding documents for details.
2.5 The scope of tender for project supervision of this project is: the entire contents of the construction drawing design document, that is, the supervision service quality, progress, cost control management and safety production supervision and management during the construction preparation period, construction period, acceptance period for acceptance, and defect liability period of this project. , Contracts, information management, and coordination of management services and other supervision services.
3. Bidder qualification requirements and performance requirements
3.1 After the tender is qualified, the bidder shall meet the following qualification conditions and performance requirements:
With independent legal personality, it must have a Class A and above qualification issued by the Ministry of Transport. In the past three years (from January 2014 to the deadline for submission of bids), at least one performance of supervision for the construction of first class and above highways with an investment of no less than RMB 60 million has been completed, and corresponding supervision and service capabilities have been provided in terms of personnel, equipment, and funds. .
3.2 The Commonwealth does not accept bids from the Consortium.
5. Submitting bid documents
5.1 Deadline for submission of bids and time for opening bids: 10:00 (Beijing time) on September 3, 2017.